A party wall contract functions as a legal document for people who co-own walls and it states the relevant procedures regarding wall or fence wall maintenance and alteration and restoration. Such legal documents help prevent disputes while ensuring additional conflicts remain at a minimum.

Real estate properties in England and Wales fall within the scope of the Party Wall etc. Act 1996 and the relevant agreement usually pertains to dividing walls adjacent to terraced and semi-detached dwellings in addition to garden walls (party fence walls).

Party Wall Contract Template & Guide on Party Wall Awards

Key Points

  • A party wall agreement becomes essential whenever construction work might cause any adverse impact on neighbouring buildings.
  • You must issue the party wall notice at least one to two months in advance of work commencement.
  • A Party Wall Notice creates an obligation for neighbours to submit their response within a period of 14 days by writing.
  • The lack of a Party Wall Agreement may trigger both legal and financial issues for the affected parties.
  • The HomeOwners Alliance indicates that Party Wall Award expenses often begin at £1,000 and stretch up to £2,000 as the minimum fee.
  • A party wall contract serves as a prevention measure to avoid additional neighbour disputes that may appear during construction work.

A Comprehensive Overview of Party Wall Contracts

Parties entering into a party wall agreement determine who takes responsibility for maintaining shared walls and making required repairs as well as alterations to them. 

Having awareness about party wall contracts allows you to prevent damage to neighbourly relationships. A party wall contract requires notification to neighbours according to timeframes listed in the Party Wall Act 1996 that states legal procedures for conflict resolution and determines responsibilities of all affected property owners.

Before beginning your project you need to provide advance notice to neighbours which must be between one month and two months depending on the specified works (one month for digging or building new walls and two months for party wall/structure alterations). An adjoining owner has exactly 14 days to reply after receiving a Party Wall Notice. Under such circumstances, an absence of response counts as a formal disagreement between parties. After the adjoining owners fail to respond within fourteen days a surveyor receives authority to issue an award about the matters. The following list contains examples of works which require notification according to regulations:

  • Repairing a party wall 
  • Inserting a DPC into the party wall (damp-proofing)
  • Underpinning the party wall
  • Inserting beams in a shared wall (e.g. loft conversion)
  • Changing the height of a party wall
  • Demolish or rebuild a party wall 

An effective party wall agreement requires parties to provide their contact information together with explicit work descriptions as well as conditions regarding work progression. Surveyors who work under the Royal Institution of Chartered Surveyors (RICS) and Chartered Institute of Building (CIOB) and Residential Property Surveyors Association (RPSA) must hold proper accreditation. The Faculty of Party Wall Surveyors (FPWS) serves exclusively to standardize practices of Party Wall Surveyors through its comprehensive guidelines. 

Understanding party wall contracts with their appropriate applications helps prevent issues via such a binding agreement.

When Do I Need a Party Wall Agreement?

Surveyors need to sign a party wall agreement in respect of notifiable works on shared walls between neighbours especially when they own semi-detached or terraced houses or commercial properties. Prior knowledge of the rights and responsibilities specified in the Act helps prevent conflicts between parties.

According to the Party Wall etc. Act 1996 you should begin the wall-sharing project only after your neighbour receives the party wall notice before starting. The construction notice contains complete information about project specifications along with drawings.

To carry out shared wall work you need to obtain a party wall agreement for these particular situations: 

  • Constructing a new wall which reaches or crosses the shared property border between two properties
  • Making alterations to established party walls through the process of raising height or adding thickness.
  • Perform excavations when digging close to an adjacent property (within 3 metres) and below the level of their foundations. 

A party wall contract ensures proper project management by preventing costly difficulties and maintaining budget and specification adherence according to this video:


Every construction project depends on a well-organised party wall agreement to guard the interests of all involved participants. Your understanding of the project requirements for party wall agreements enables efficient completion of work without problems (see Top 5 Things About Your Party Wall Agreements You Need to Know Before Renovating).

Situation Requirement
Build a new wall at the boundary of two properties Section 1 Notice
Make alterations to a party wall or party fence wall Section 3 Notice
Excavate within 3 metres of an adjoining property Section 6 Notice

The Important Elements of a Party Wall Contract Template

The surveyor will compose a party wall contract template by incorporating all essential components needed to validate the award. An effective agreement needs to specify all terms and conditions related to shared walls as well as the associated construction work including both participants and identification of locations and statement of agreement contents.

All necessary party wall documents should be included in the Party Wall Award including notices together with a Schedule of Condition and drawings. A standard part of the contract must contain both repair and maintenance conditions together with specific owner responsibilities and ownership rights descriptions.

Required Documentation

These documents would generally be included in a “party wall contract”:

  • The notice to carry out work
  • Drawings/plans
  • Structural Engineer calculations
  • Schedule of Condition
  • Party Wall Award

Standard Terms and Clauses 

Typical elements of a party wall contract can include:

  • Maintenance and repairs provisions
  • Permissible changes/modifications to the party wall
  • Access to the neighbouring side for repairs and maintenance 

The addition of such helpful elements to a party wall contract template ensures agreement suitability for specific projects allowing project costs to remain on track and defining responsibilities accurately.

The Process of Getting a Party Wall Award

Every person who intends to modify a shared wall needs approval through a party wall award system. 

Before starting any work the homeowner needs to issue a notice to their neighbour at least one or two months ahead of time. The notice contains essential information that consists of everyone’s names along with addresses, work description, and start date.

A written reply from the neighbour needs to happen within a fourteen-day period after a notice is received. Refusal to acknowledge the notice is “deemed dissent”. 

Each party will then need to select surveyors who will prepare a party wall award when dissent occurs. The party wall award determines all principles regarding shared walls including their modifications and specifies who maintains and repairs them.

The process of receiving a party wall award depends on the work type and could span from weeks to many months. Seek consultation with a party wall expert about three months ahead of construction time to steer clear of time setbacks. The party wall contract specifies the rights and responsibilities of both owners according to the Act and the document requires an objectively fair approach for them both.

The process of resolving disputes during construction becomes simpler through party wall awards because these documents outline precise regulations for shared walls to prevent conflicts from arising. By understanding the process to obtain party wall awards through proper contracts one can guarantee their project achieves its target.

Party Wall Surveyor Role and Responsibility 

A party wall surveyor plays an essential role in solving matters between neighbours and creating settlements known as party wall awards. 

The surveyor examines the wall between shared properties and establishes the agreement terms followed by presenting the final award. Surveyor fees and dispute complexity determine the total costs for hiring their services.

The contract rate of local surveyors in London who handle property owner responsibilities starts at £250 each hour with applicable taxes. Basic party wall awards cost a minimum of £1,000 in fees to the surveyor. When you undertake projects with multiple components such as basement conversions the expenses may surpass £10,000. #

Surveyors who work for building owners charge a fixed fee but the people who represent adjoining owners typically bill their services at an hourly rate.

Appointing Your Surveyor

A surveyor can not serve as an interested party in accordance with The Party Wall etc. Act 1996 thus owners can not perform the role of surveyor. A Schedule of Condition serves importance because it provides evidence for identifying any subsequent alleged damage.

A Surveyor’s Duty

Surveyors maintain their position until inability to perform their duties or death happens. They develop the award following an inspection of the work sites and mutual agreement on project standards. After the award issuance they may conduct inspections at different stages including interim and final stages.

Cost Implication and Surveyor Fees

Surveyor professionals often encounter difficulties when owners struggle to believe in their impartiality. The job of surveyors involves resolving conflicts rather than entering into disputes. The RICS Party Wall Legislation & Procedure issued by the organisation in July 2019 provides specific details about this aspect.

Building surveyors and professionals with architectural degrees or construction law experience constitute most of the party wall surveying field. To do their job effectively, surveyors must have both thorough understanding of the Party Wall Act and expertise in mediating issues. After assessing planned works the party wall surveyor chooses which type of notice will be used in the procedure.

Service Fee
Standard party wall awards Min. £1,000
Complicated projects (e.g. basement conversions) £10,000+
Adjoining Owner Surveyor (hourly rate) £250 plus VAT

Party wall surveyors act as mediators when disagreements occur between property owners. Site inspections are carried out to evaluate how party wall works affect its structure. The surveyors will issue legally binding awards regardless of failed talks to provide essential guidance which prevents legal issues while enhancing project safety.

Common Issues & Disputes Resolution Methods

People can initiate party wall disputes for various causes including maintenance demands and wall modification requests as well as breaking Party Wall etc. Act 1996 regulations. Solving issues in party wall arrangements requires a full understanding of both contract terms and the Party Wall Act legislation.

Parties bound by a party wall contract must follow specific tasks defined there and damage cases can be handled through party wall awards issued by surveyors.

The common disagreements therefore include: 

  • Disputes over maintenance and repairs
  • Altering the shared wall
  • Non-compliance with conditions specified within the Party Wall Act 1996

A party wall surveyor needs to be consulted in order to address these difficulties. They have the capability to prepare a party wall contract which meets your requirements. The party structure rules together with modifications will be contained within this award.

Any conflict between owners relating to party wall contract terms needs to proceed to county court for settlement. Those seeking legal help for party wall disputes through a specialist solicitor must expect to pay major expenses.

Dispute Resolution Method Description
Party Wall Surveyor The surveyor appointed to resolve your dispute and make the party wall award
County Court The court that can provide legal determination on compliance with your party wall contract

 

Understanding common disputes and their solution, as explained in this article on How to Keep Party Wall Costs Down, supports both minimising costs and developing positive relationships with neighbours.

Create Your Party Wall Contract: Download Our Template

To make a party wall contract, you must follow several steps. First, gather all needed documents, including a notice of intention to work and any plans or specifications. These documents are key for the agreement, showing the shared wall’s terms and any changes.

Using a party wall contract template can help, which should cover the party wall’s terms and each owner’s rights and duties. You can find templates online or get one custom-made with a surveyor’s help. For more information, see Top 9 Questions About Party Wall Surveys. Important things to remember when making a party wall contract include:

  • Notification: the building owner must notify the neighbour prior to starting works.
  • Surveyor fees: the building owner ordinarily pays the entirety of Party Wall Surveyors’ Costs for both sides.
  • Dispute resolution: a good agreement can cut legal costs by as much as 50% and make the project run more effectively.

The creation of comprehensive party wall contracts becomes possible through these steps and key points thus helping to prevent disputes. 

Legal Enforcement

Party wall contracts are legally substantial because violation may lead to financial compensation or court-ordered injunctions. The contract of a party wall creates a binding legal agreement.

Breach of Contract Repercussions

Non-compliance with the Party Wall Act requires you to pay substantial costs containing legal fees and compensation payments. Nutt v Podger resulted in a £4,000 breach of damages according to the Act.

Appeal Process

An owner who disagrees with a party wall award has the right to appeal to the county court yet court judges typically maintain the existing party wall award if it proves valid. The court views disregard for Party Wall procedures as a significant matter that brings about legal conflicts and additional expenses. You have fourteen days to pursue an appeal of a party wall award.

Party Wall Act Section Description
Notice Duration 1-2 months prior to starting work
Response Time 14 days response time to a party wall notice
Award Appeal 14 days to challenge a party wall award in county court

Conclusion: Party Wall Contract Template Download

The execution of a well-drafted party wall contract minimises potential disagreements which might occur. This guide assists property owners to develop legally sound party wall agreements that support project construction success while protecting owner interests.

The establishment of party wall contracts requires extensive documentation together with direct surveyor-assisted mutual agreement. A thorough examination of the agreement followed by selection of unbiased surveyors shapes legal processes and makes agreements both fair and enforceable before finalisation.

For successful party wall agreements all parties should engage in open communication while working together. The successful operation of building projects depends on property owners being prepared to collaborate on specifics which prevents costly litigation thus allowing construction advancement.

Download our party wall contract template



FAQ

What is party wall contract?

The Party Wall Act establishes legal agreements among property owners who share walls or execute nearby construction works. Party walls/structures maintenance and repair tasks together with alteration procedures are included in this legal agreement.

Are party wall agreements valid?

Under the Party Wall etc. Act 1996, party wall agreements resolve disputes and define rights for all involved parties. They are legally binding.

What key components are in a party wall contract?

The essential elements of a well-written party wall agreement need to include parties’ details and complete description of the shared wall alongside specified agreement terms.

When do I need a party wall agreement?

A party wall notice becomes necessary for individuals who share walls in semi-detached structures before starting construction works. Two forms exist for notifiable works: digging within 3-6m of a neighbouring property below the level of neighbouring foundations or building a wall on the line of junction of neighbouring properties. The regulations state that commercial buildings also require these notifications.

What does a party wall contract template include?

The template must include essential information such as party details with a description of the wall and its connected works and project operation procedures for nuisance reduction.

What documentation is included in a party wall contract?

A party wall award needs to be created in conjunction with a notice of works and optionally paired with a schedule of condition.

What standard clauses and terms are there in a party wall contract?

This document provides instructions regarding wall modifications that, say, limit exposed beams to half of the party wall, outline procedures for maintenance and repair tasks, etc.

What rights and responsibilities do parties have in a party wall contract?

Parties have access to the wall for maintenance purposes while being required to maintain its good condition.

What is a party wall award?

The party wall document from a surveyor outlines the necessary procedures regarding notifiable works as listed in Different Types of Work for Party Wall.

What role does a party wall surveyor have?

The surveyor’s role is dispute resolution and making the awards which settle disagreements (see What is a Party Wall Dispute?). A surveyor inspects the wall while setting terms that create beneficial awards for both property owners.

What are the costs of appointing a party wall surveyor?

The building owner bears total responsibility for payment of fees that are determined by surveyor rates and dispute complexity.

Is a party wall contract legally valid?

When an individual breaches a contract it triggers intense legal trouble because failure to comply can cause damage claims and the filing of injunctions that prevent work development.

Can I appeal a party wall award?

The appeals system is defined by the Party Wall etc. Act 1996. An unhappy party can seek appeal at the county court yet the court lacks authority to cancel a valid award decision.

 

 