Planning permission was granted. A party wall notice was served. The builders started. Then an injunction stopped the job with the ground floor half built. Hassan v Heath (2025) UKUT 242 (LC) is a London case in which the missing piece was not planning or the Party Wall etc. Act 1996, but a 1986 covenant on the title. For anyone weighing up a party wall notice restrictive covenant problem before a build, the decision shows how the three regimes sit side by side and why none of them excuses the others [1].
Key Takeaways
- A 1986 covenant prevented any alteration to the external plan or elevation of 24 Elm Road, Kingston upon Thames, and any other building on the land.
- The owners obtained planning permission and served a line of junction notice under section 1(5) of the Party Wall etc. Act 1996, but the neighbour relied on the covenant and obtained an interim injunction.
- The Upper Tribunal modified the covenant to allow the ground floor works to be finished, and refused to modify it for the roof extension.
- Two expert valuers agreed there would be no loss in value to the neighbour’s house, yet that did not decide the roof issue.
- The owners were found to have been “ill-advised, and possibly naive” rather than cynical.
The properties and the covenant
No. 24 Elm Road is a two-storey Victorian house on what was once a double-width plot. A former stable building behind it was converted to a house, No. 24A, which wraps around No. 24 in an L-shape and has a conservatory looking across the garden and drive [1].
In 1986 the then owner divided the title and sold No. 24. The buyer covenanted that “the external plan or elevation of the dwellinghouse shall not be altered” and that no other building or erection would be put on the land. The benefit passed with No. 24A.
Mr Hassan and Dr Osman bought No. 24 in November 2017. Mr Heath bought No. 24A in March 2021.
Planning permission, then a party wall notice
The applicants wanted more space for their family. After two refusals and one withdrawn application, the Royal Borough of Kingston upon Thames granted permission on 23 January 2024 for a front hip to gable roof extension, a rear roof extension with rooflights for a loft conversion, and a single storey side extension. Mr Heath was the only objector.
The decision records that from April 2023 Mr Heath had told the applicants and their architects about the covenant.
On 24 March 2024 Mr Hassan served a notice under section 1(5) of the Party Wall etc. Act 1996, saying he intended to build on the line of junction between the two properties to extend the ground floor [2]. Mr Heath replied on 9 April 2024 with two letters. In the first he said he did not think it appropriate to respond to the Party Wall Act notice and reminded the applicants of the restriction on their title. The second was a letter before action for an injunction.
Works start, and the court stops them
The works went ahead. Mr Heath issued a claim on 3 June 2024. Mr Hassan said the applicants did not know of it until 19 July, by which time the ground floor extension was half complete. An interim injunction was granted on 20 August 2024. No roof works had started [1].
Some of what had been built also departed from the planning permission: a canopy had been added over the front door, the single storey element was about 200mm higher than approved, and a rear ground floor window facing No. 24A was about 400mm too high.
The applicants then applied to the Upper Tribunal (Lands Chamber) under section 84(1)(aa) of the Law of Property Act 1925 to modify the covenant [3]. The case was heard on 16 July 2025 by Mr P McCrea OBE FRICS FCIArb, who inspected both houses the day before. The decision is dated 5 August 2025.
Why a party wall notice restrictive covenant conflict is not solved by the notice
A notice under section 1(5) tells the neighbour that a wall will be built wholly on the building owner’s own land at the line of junction. The neighbour’s agreement is not needed for that kind of wall. But the Act deals with how boundary works are carried out. It gives no right to build something the title forbids. Mr Heath’s refusal to engage with the notice, while pressing the covenant, was consistent with that.
The expert valuation evidence
Mr Ruaraidh Adams-Cairns FRICS and Mr John Howse MRICS provided an agreed joint statement with before and after photographs. Neither gave oral evidence. They agreed that, provided the works were properly completed either as consented or with the changes actually made, there would be no diminution or impact on the market value of No. 24A [1].
The Tribunal accepted that. It was satisfied that the ability to prevent the works was not of substantial value. But the statutory test asks whether a covenant secures practical benefits of substantial value or advantage, and the Tribunal noted that these are alternatives. A neighbour can lose nothing in money terms and still have an advantage worth protecting.
Agreed valuation evidence answered the question of value. It could not answer the separate question of advantage.
The result: ground floor yes, roof no
The roof works. The application to modify the covenant for the roof alterations was refused. The Tribunal had sympathy for the applicants, but noted that Mr Hassan fairly accepted they knew the house was too small when they bought it and were aware of the covenants, having been advised they would not be an obstacle. Their needs did not override Mr Heath’s wish to keep the restrictions in place, and keeping the status quo was not contrary to the public interest.
The ground floor works. Here the Tribunal found nothing particularly objectionable. The extra 200mm was “relatively innocuous”, the window gave only an oblique view of part of the conservatory, and the canopy was no more than an irritation. Preventing these works was not of substantial advantage to Mr Heath.
Discretion. Mr Heath argued the applicants had blatantly disregarded the covenant. The Tribunal did not find a cynical breach. They “appear to have been ill-advised, and possibly naive”, and work stopped once the injunction was in place. Exposing them to an order to demolish would be disproportionate to the very modest impact on the neighbour.
The covenant was modified to allow the ground floor works, including the built variations, and nothing else.
Lessons for London building owners and party wall surveyors
- Read the title register first. Order official copies of the register and any documents referred to in it before paying for drawings. Covenants against alteration are common on divided plots and mews conversions.
- Treat a neighbour’s warning as a stop sign. A covenant raised in correspondence should be resolved before works begin, not after.
- Do not confuse a notice with consent. Serving a line of junction or party structure notice starts a statutory procedure. It does not answer objections that arise outside the Act.
- Party wall surveyors should flag what they see. A surveyor’s role under the Act is limited, but a building owner is better served by one who points out that a covenant dispute is live and that legal advice is needed.
- Build to the approved drawings. Departures of 200mm and 400mm became issues in two forums.
- Use joint expert valuation evidence. An agreed statement kept costs down and settled the value question, even though it did not settle everything.
- Apply to modify before building. Section 84 exists for this purpose. Building first risks an injunction and weakens the application.
Frequently Asked Questions
Does a party wall notice allow building in breach of a covenant?
No. The Party Wall etc. Act 1996 governs how certain boundary works are done. It does not release restrictive covenants.
Can a restrictive covenant be changed?
Yes. The Upper Tribunal can discharge or modify a covenant under section 84 of the Law of Property Act 1925 on specified grounds [3].
Why did the valuers’ agreement not decide the whole case?
They agreed there was no loss in value. The Tribunal still had to consider whether the covenant gave a substantial advantage, which is a separate limb of the test.
Were the owners ordered to demolish the extension?
The Tribunal modified the covenant so the ground floor works could be completed. It refused modification for the roof works, which had not started.
Conclusion
Hassan v Heath shows that planning permission, party wall procedure and title restrictions are three separate hurdles. London owners planning an extension should have the title checked, resolve any covenant before notices are served, and instruct a party wall surveyor who will raise wider risks early. This article is general information based on the published decision and is not legal advice.
References
- Hassan and Osman v Heath (2025) UKUT 242 (LC), The National Archives. caselaw.nationalarchives.gov.uk.
- Party Wall etc. Act 1996, legislation.gov.uk. legislation.gov.uk.
- Law of Property Act 1925, section 84, legislation.gov.uk. legislation.gov.uk.
Speak to a RICS chartered party wall surveyor
Free initial consultation. Notices, awards and schedules of condition across London and nationwide.