Two surveyors made an award of about £4,000 for a neighbour’s damage. The Court of Appeal held it was void, because the owner doing the works had never served a notice [1]. Power v Shah is not a new decision, but it remains the binding authority in November 2026, and it still catches London neighbours out. Where there is a party wall, no notice and damage, the dispute moves to court, and expert evidence becomes the heart of the case.
Key Takeaways
- Only the building owner’s notice triggers the Act. Without one, the surveyor procedure in section 10 cannot start [1].
- Adjoining owners cannot invoke the Act alone. They cannot appoint surveyors on the building owner’s behalf where no notice was served [1].
- An award made without a notice is void. Fees under it may be unrecoverable [1].
- The remedy is in court. That means claims in nuisance, trespass or negligence, and possibly an urgent injunction [1].
- Court claims are won on evidence. Independent expert surveyor evidence usually decides cause and cost.
What Happened in Power v Shah
The building owner started works without serving any notice under the Party Wall etc. Act 1996. The adjoining owner believed the works fell within the Act. Its surveyor considered that a dispute had arisen and appointed a second surveyor to act for the building owner [1].
The two surveyors then made an award. It gave the adjoining owner about £4,000 in compensation and provided for about £2,300 in fees for each surveyor. The building owner never took part [1].
The surveyors tried to recover their fees in the Magistrates’ Court. The building owner asked the County Court to declare the award void.
Why the Court of Appeal Said the Award Was Void
The reasoning was direct [1]:
- Service of a notice by the building owner is the sole trigger for the Act.
- The Act gives rights to building owners. It does not give adjoining owners a freestanding right to start the process.
- The section 10 dispute procedure cannot operate without a prior notice.
- An adjoining owner cannot choose the Act in place of common-law remedies.
The court relied on the earlier case of Blake v Reeves and said that remarks in Crowley v Rushmoor BC suggesting otherwise were wrong [1].
No notice means no Act, and no Act means no award.
Power v Shah, No Notice and Expert Evidence: What Adjoining Owners Need
When the Act does not apply, an adjoining owner has two realistic routes. One is to press the building owner to serve a notice, which brings the Act back into play. The other is to go to court [1].
In court there are no appointed surveyors to settle matters by award. The judge decides on the evidence. For a damage claim, that normally means showing:
- The condition before the works. A schedule of condition with dated photographs is the best proof.
- What changed. Crack monitoring, inspection notes and further photographs.
- Cause. Whether the neighbour’s works, and not age or earlier movement, caused the damage.
- Remedy and cost. The scope of repair that is reasonably needed and what it should cost.
An independent chartered building surveyor usually gives this evidence, sometimes with a structural engineer.
Party wall surveyor or expert witness?
The two roles are different. A party wall surveyor appointed under section 10 exercises a statutory function between two owners. An expert witness gives opinion evidence to a court. Under CPR Part 35 and Practice Direction 35, the expert’s overriding duty is to the court, the court’s permission is needed for expert evidence, and in lower-value claims the court may direct a single joint expert.
From 30 November 2026, the RICS professional standard Surveyors acting as expert witnesses, 5th edition, also applies. It confirms that the primary duty is to the tribunal, requires any use of artificial intelligence to be identified in the report, and bars outcome-dependent fees except in exceptional circumstances [2].
Practical Steps for London Neighbours
If works next door have started without notice:
- Write to the building owner at once and ask for a notice to be served.
- Record the condition of the property now, with dated photographs.
- Take early advice on an injunction if the works are risky.
- Do not rely on a surveyor “appointing” for the other side. After Power v Shah, that does not work [1].
If you are the one building:
- Serve the right notices before work starts.
- A missing notice does not avoid liability. It moves the dispute into court, where costs are usually higher.
Frequently Asked Questions
Can an adjoining owner start the party wall process?
No. Only the building owner’s notice triggers the Act [1].
Is an award valid if the building owner ignored the process?
Not where no notice was ever served. In Power v Shah the award was void [1].
What can an adjoining owner do instead?
Ask for a notice, or bring a court claim in nuisance, trespass or negligence, with an injunction where needed [1].
Why does expert evidence matter so much?
Because the court, not a pair of surveyors, decides what damage was caused and what repair is reasonable.
Conclusion
Power v Shah closes off a tempting shortcut. An adjoining owner cannot force the Party Wall Act onto a neighbour who has served no notice. The dispute becomes an ordinary court claim, and such claims turn on clear, independent evidence.
The next step for adjoining owners is to record the condition of their property early and take advice before damage worsens. Building owners should serve notices in good time.
This article is general information only and is not legal advice. Take advice on your own circumstances.
References
- Cornerstone Barristers, “Court of Appeal rules that Party Wall Act awards cannot be imposed on building owners by adjoining owners” (16 March 2023). cornerstonebarristers.com.
- RICS, Surveyors acting as expert witnesses, 5th edition (July 2026, effective 30 November 2026). rics.org.
Speak to a RICS chartered party wall surveyor
Free initial consultation. Notices, awards and schedules of condition across London and nationwide.